So now i have patch-3.mpq all the way through patch-9.mpq. Is there an easy way to merge them all together into, without redoing all the extracting and stuff.
So now i have patch-3.mpq all the way through patch-9.mpq. Is there an easy way to merge them all together into, without redoing all the extracting and stuff.
unfortunatly, there isn't.
The Age of Exploration is over. Now is the Age of Creation.
Come on....there has to be someway...
u can make model edits called patch-a, patch-b and so on
"a" all the way through "z"? And which would take priority patch-a.mpq or patch-9.mpq?
Last edited by svloco; 04-15-2007 at 01:49 PM.
bumpin this
patch-a would
Last edited by nosfiarmus; 04-17-2007 at 01:49 AM. Reason: Auto-merged Doublepost