Originally Posted by
tino4ka
Sychotix,
Then I was in need of a forum for one youth site I found one and installed it in 20 mins. Also I've spend around 15 mins looking for color scheme and 20 more for creating appropriate themes branches. So totally I've spend less then an hour to do it. Could I repeat it today? I will do it even quicker, there is at least 2 very advances but easy to install forum engines which I know and google for sure have both of them on the first page.
Of course later om I've added a lot of addons and change design completely, but to run a forum you need as maximum 3 hours if you never ever did it before. I could even except 1 day delay, but still not 5 days delay, especially then I personally waiting something what could be made in 1 hour maximum and was promised to me 2 times by Hiber (personally). Now the soft is a paid one and customers has to be respected (at least). Hiber is not answering mails and not answering in MSN, we still have no forum and no promised futures and it is just sad, really.